jonnifyknowledge map
Agile Agent Workflow / A7 · Portal exemplar

A7 · chapter overview

The Portal exemplar

Every Part taught one move on a worked fragment. A7 runs the whole loop — decompose, roadmap, spec, brief, build, harden, accept — end to end on the Portal, zero to production.

This is the capstone: the single uninterrupted run that proves the moves compose into a shipped, multi-surface system, from an empty repository to a deployed Portal. A7 is worth running only because every rung it ships was first made production-grade by the spec layer and the reliability work above it — a zero-to-production exemplar cannot run on an increment that only passes the happy path. The arc below re-centres the course on A7, and a second figure walks the seven steps A7.01–A7.07.

Where we are

The course is one argument carried across eight Parts. The first seven are built: A0 framed the method, A1 made the case for thin, provable slices, A2 turned a vision into a backlog, A3 planned its delivery, A4 defined and proved each rung, A5 briefed an agent to build it, and A6 hardened the result to production quality. A7 is where every prior Part composes into one run.

The arc below walks the eight Parts. Select one and the readout reports its title, what it delivers, and whether it is built — the same orientation this landing exists to give. The default selection is A7, the Part you are reading.

The course arc — eight parts, A0 to A7

A0 Foundations A1 Why A2 Decompose A3 Roadmap A4 Spec A5 Brief A6 Reliability A7 Portal
A7 · Portal exemplar — /portal. Delivers: the whole loop run end to end on the Portal, zero to production. Status: you are here. · 7 of 8 parts built before this one; A7 composes every prior Part into one uninterrupted run.

A0–A6 each taught one move; A7 runs them all as one loop on the Portal — zero to production.

The whole loop, in seven steps

A7 is one uninterrupted run of the workflow, carried over seven steps from an empty repository to a deployed Portal. Each step runs a technique a prior chapter taught: A7.01 decomposes the vision (A2), A7.02 plans the delivery (A3), A7.03 specifies the rung (A4), A7.04 briefs the Author and A7.05 builds the increment (A5), A7.06 hardens it to production quality (A6), and A7.07 accepts and ships — closing the loop.

Select a step below and the readout reports its phase and the prior chapter whose technique it runs. The figure names the sequence at the roadmap's altitude; the step's internals are deferred to the chapter's triad, not invented here.

The whole loop · pick a step

empty repository — the seven steps — deployed Portal A7.01 A7.02 A7.03 A7.04 A7.05 A7.06 A7.07 PHASE Decompose the vision RUNS A2 — decomposition: vision into a value ladder
A7.01 · Decompose the vision — runs A2 (decomposition: vision into a value ladder). Step 1 of 7 of the zero-to-production run. · the step's internals are detailed once the a7.* triad is seeded.

The principle

A method is proven not by separate lessons but by one whole run that ships a real system. The moves must compose, in sequence, from nothing to production.

On the Portal

A7 runs the loop once on the Portal — the branded store, the event-sourced engine behind one facade, the Phoenix web app, the Telegram bot, and the student dashboard come up in dependency order, each rung shipped to production quality before the next.

The exemplar is the course's method demonstrated in full, from an empty repository to a deployed Portal.

Orientation dives

Three short dives orient you before the chapter's steps. Read them in order: why an end-to-end exemplar earns its own Part, what the seven steps cover, and how the loop runs once on the Portal.

The chapter ahead: the seven steps A7.01–A7.07

A7 carries the whole loop over seven steps, from an empty repository to a deployed Portal. Named at the roadmap's altitude, they are the zero-to-production arc: decompose the vision, plan the delivery, specify the rung, brief the Author, build the increment, harden it to production, and accept and ship. The first six each run a technique a prior chapter taught; the seventh closes the loop.

A7.01
Decompose the vision — runs A2: the Portal vision turned into a value ladder of testable stories.
A7.02
Plan the delivery — runs A3: the backlog sequenced into thin-but-robust increments grouped into milestones.
A7.03
Specify the rung — runs A4: each rung defined and proven, correct by definition.
A7.04
Brief the Author — the machine-readable brief the Author builds from.
A7.05
Build the increment — the Author turns the spec into running code.
A7.06
Harden to production — supervision, boundaries, and property tests turn the built increment production-grade.
A7.07
Accept and ship — accepted only at STATUS: PASS; shipped to production, closing the loop.

A7's steps will be detailed when its triad (a7.{md,stories.md,llms.md}) is seeded. The chapter, per the course roadmap, runs the whole Author/Operator loop end to end on the Portal — zero to production — across the seven steps A7.01–A7.07. The step internals named above are the sequence at roadmap altitude, not the per-step acceptance criteria that the triad will carry. Start with the orientation dive Why an exemplar.

References

The sources this chapter draws on for running the whole system end to end, keeping it releasable at every increment, and the inspect-and-adapt loop run whole — and where the prior layers A7 composes are taught in the course.

Sources

Related in this course